|
|
|
|
LEADER |
00885nam a22002537a 4500 |
001 |
277001 |
008 |
090126s2008 xxe ||| |||| 00| 0 eng d |
020 |
|
|
|a 9781848210349 (rel.)
|
041 |
0 |
|
|a eng
|
082 |
|
|
|a 658.5/3
|
245 |
0 |
0 |
|a Resource-constrained project scheduling :
|b models, algorithms, extensions and applications
|c edited by Christian Artigues, Sophie Demassey, Emmanuel Néron...
|
260 |
|
|
|a London, U.K. ;
|a Hoboken, N.J. :
|b ISTE :
|b Wiley,
|c cop. 2008.
|
300 |
|
|
|a 1 vol. (308 p.) ;
|c 24 cm.
|
490 |
1 |
|
|a CAM : control systems, robotics and manufacturing series
|
504 |
|
|
|a Bibliographie: p. [279]-301. Index
|
650 |
|
|
|a Ordonnancement (gestion)
|
650 |
|
|
|a Production
|x Contrôle
|
700 |
1 |
|
|a Artigues, Christian.
|4 edt
|
700 |
1 |
|
|a Demassey, Sophie.
|4 edt
|
700 |
1 |
|
|a Néron, Emmanuel.
|4 edt
|
993 |
|
|
|a Livre
|
994 |
|
|
|a PS
|
995 |
|
|
|a 130706965
|
997 |
|
|
|0 277001
|